Stage 7 Hardcore is laid to a minimum of 100mm deep and compacted to form the base layer of the slab. |
![]() |
Stage 11 Concert 100mm thick is laid to bring the slab up to the finished floor level. |
![]() |
Stage 8 A blinding screed of sand is laid over the hard-core to prevent any sharp stones puncturing the damp proof membrane. |
![]() |
Stage 12 The concert is floated to a smooth level surface, suitable for tiling or carpet. |
![]() |
Stage 9 A visqueen damp proof membrane is laid over the sand blinding and lapped onto the inner leaf of brickwork. |
![]() |
Stage 13 The outer leaf of the wall is built. In this case, artificial stone to match the house is used. |
![]() |
Stage 10 Floor installation is installed at this stage. |
![]() |
Stage 14 The inner leaf of the cavity is built to complete the basework. The same material as the outer leaf has been used to provide a feature stone finish. |